Town of Palisade – Infiltation/Inflow Study

WestWater Engineering was responsible for conducting an infiltration/inflow study on a section of the Town’s main outfall sewer line that had been experiencing high flows during the summer months that was causing permit violations at their aerated lagoon treatment plant.

With the use of the “Manning Dipper” continuous flow recorder, certain portions of the line were determined to have illegal inflow connections to irrigation systems.