Town of New Castle – Raw Water Supply Line

WestWater Engineering completed the Preliminary and Final Design through construction for the New Castle raw waterline that conveys water from an intake on Elk Creek approximately 5,000-feet to the water treatment plant.

This included a unique raw water bypass to the treatment plant to allow the existing raw waterline to be taken out of service while the new 16-inch diameter pipeline was installed. Because of the tight working conditions, PVC pipe was used in lieu of ductile iron pipe and air-vacuum release valves were placed at selected locations.